2018-05-02
Open Car Park
Customer: Southern New Hampshire Medical Center, Nashua, New Hampshire.
Date Completed: August 2008
Comment: Waterproof approximately 100,000 square feet of concrete parking garage
with Seal Once MSW to prevent water penetration and salt and chloride deterioration.
Preservation Building
Customer: National Grid Salem, Massachusetts.
Date: August 2009
Problem: Brick and mortar very old, water was penetrating and causing mold in the
interior.
Solution: Repaint loose mortar and apply two coats of Seal Once MSW.
Singapore Bungalow
Customer: Singapore bungalow
Date Completed: Oct 2011
Problem: Walls are porous and water seeped into the house during a heavy rainfall.
Solution: Apply 2 coats of Seal Once MSW over exiting emulsion paint.
River Safari
Customer : River Safari (Mandai Zoo)
Date of Application: 15 Nov 2011
Problem: Conventional water proofing system requires the installation of a membrane
followed by 25mm concrete cover. Seal Once MSW can just be applied directly onto the
existing concrete and water proof the river duct.
Singapore Terrace Houses
Customer: Singapore Terrace House
Date Completed: Dec 2011
Problem: Water seeped through the roof of car porch and affected the ceiling of the car
porch during a rainfall.
Solution: Sealed the top of the car porch by applying 2 coats of Seal Once MSW and the
problem was solved.
Customer: Singapore Condominium Poolside
Date Completed: Mar 2012
Problem: Efflorescence occurred at the tiles’ joints, oozing out the unsightly white
Calcium Carbonate..
Solution: Clean and patch up the joints and apply 2 coats of Seal Once MSW and the
problem was solved.
Private Condominium
Customer: Singapore New Condominium Project
Date Completed: Mar 2012
Problem: Water seeped through the concrete deck (left photo) affecting the soffit of the
basement car park (right photo).
Solution: Sealed the top of the car porch by applying 2 coats of Seal Once MSW and the
problem was solved.
Commercial Building
Customer: Singapore Water Tank Internal
Date Completed: Mar 2012
Problem: Ground water seeped through the base of the concrete tank affecting the
internal painting of tank internal.
Solution: Sealed the damp concrete surface by applying Seal Once MSW and the
problem was solved.
Customer: Private House
Date Completed: Mar 2013
Problem: Water seeped through the wall, balcony and façade causing rebar corrosion
before handing over the newly built house.
Solution: Patch up all large cracks, wash with Concrete Cleaner and apply 2 coats of
Seal Once MSW nanotech water proofer and the problem was
Duration of whole works: Patching of cracks – 1 day
Applying Seal Once MSW - 2 hours
St Thomas Walk
Customer: Private Condominium
Date Completed: Mar 2013
Issue: Traditional method of repairing water proofing system will be very tedious and
messy.
Procedure: Wash with Concrete Cleaner and apply 2 coats of Seal Once MSW nanotech
water proofer and the problem was solved.
Duration of whole works: Half a day to water proof the existing toilet without hacking of
tiles.
Marina Bay Sands Casino Laoding Bay
Customer: MBS
Date Completed: Mar 2013
Problem: The loading bay’s epoxy floor coatings failed and water seeped through the
floor to the warehouse below.
Solution: Wash with Concrete cleaner and apply 2 coats of Seal Once MSW nanotech
water proofer and the problem was solved.
Duration of whole works: 2 hours without affecting loading/unloading operations.